Project story · September 2026
A Whole-Home Renovation in Beaumont
Before the new finishes: September project records document kitchen and bathroom demolition, exposed framing, and the completed roof stage of a Beaumont home renovation.
Opening up the kitchen and bathroom
The September 15 project log records removal of the kitchen cabinets and sink, along with stripping work in the garage. By September 21, bathroom demolition included the shower, vanity, old framing, tile and thinset.
These were different parts of the same renovation. The photos and dates below document specific stages of the work.
From exposed framing to the roof stage
A September 22 photo shows the structure exposed during renovation. The following day’s project log records completed roof decking replacement and roof replacement.


Project photographs and descriptions reflect the work documented in September 2026.
Planning your own renovation
A whole-home remodel brings several areas of a property into one scope. Tell us which rooms need to change, what you want them to do better, and your approximate timing.
Explore our residential remodeling services for kitchens, bathrooms and whole-home renovations, or view all services. For offices, churches and business interiors, see commercial remodeling.
What would you like to change?
Tell us your city, the space involved and your priorities. Request a free estimate to discuss your renovation.
